Case Study One

Lifting of all plant and equipment on a CNG filling station

Get a Quote

Fill all information details to consult with us to get sevices from us

    Project Details

    • Lifting of all plant and equipment on a CNG filling station
    • 24 Tonnes @ 21 Metre Radius, 36.9 Metre Boom. 8 Point lift with spreader beams in a one-over-two configuration
    • Liebherr LTM 1230-5.1
    • Two of the lift positions were too close in proximity to some 275kV power lines to lift the plant directly onto the slabs. After liaising with the client and SPEN, a solution was reached where the loads could be installed safely, with the crane still sitting in an area which complied with SPEN guidelines around safe distances for working and potential collapse of the crane. The only practical way to achieve this was to land the plant initially in a safe area further away from the power lines, and then move the equipment into their final positions by means of manually skating them, not an easy task on the mainly loose stone floor that was in the lift area.